Polar Air Cargo Hangar at Prestwick International Airport
|
We designed, made and erected the complete structure using our patented segmental tied portal concept. Design fabrication and erection took 26 weeks.
A safety feature is the permanent, all round Roof Edge Protection for use during construction and for future maintenance.
|
We also designed and made the electro-mechanical doors complete with outriggers to allow full width opening.
We ensured that Health and Safety and CDM regulations were met during construction, and for the design life of the structure.